CacheBeauty.com
Search our Site:

sitemap

Index

Wholesale

E-mail

Shipping Policy

Shampoo Bowl Installation Instructions

 

MODEL 10

  • Fasten Mounting Plate to wall (  32" is suggested from floor to top of bracket  ). This bracket height is suggested to obtain the most suitable neck rest height. However, the bracket can be located higher or lower to suit the individual shop owner.

  • Place bowl lugs in slots and push down until it rests on edge of plate.

  • Tighten all bolts securely and make final adjustment with leveling bolt.

 

*******************************************

CacheBeauty.com is the source for the finest in beauty salon equipment!

Other items of interest:  Index of Products

 

Curling Irons

Brush Irons

Crimpers & Flat Irons

 

Hot Spa Foot Bath

Pedicure Foot Bath

Massagers

 

Caruso steam roller hairsetters

Caruso

Steam Rollers

 

Permanent 

Hair Removal

 
Home Electrolysis

 

Vector Electrolysis System

If you don't purchase online then Fax or Mail the No Risk Order Form.

Phone: 1-800-643-0333

Home

Index

Wholesale

E-mail

Shipping Policy


 

Copyright © 1998-2014 Cache Beauty Supply, Inc.

All Rights Reserved